Primrose Park, Westford, MA 
Performed traffic impact assessment (TIA) study, highway widening and signalized intersection design for this 212,000 sf office and retail complex. The TIA was for a MEPA Environmental Impact Report (EIR) and conformed to the EOEA/EOTC Guidelines for EIR/EIS Traffic Impact Assessments. Ten intersections were studied for project generated traffic impacts. One intersection, Route 110/Boston Road was identified for mitigation and was redesigned. Additionally, Route 110 is being widened to accommodate a channelized left hand turn lane for access to the Park.
Contact: Ryan Development, Robert Walker, and (978) 692-9450

 
Middlesex St./High St. Intersection, Reading, MA 
Performed an intersection capacity study for the Middlesex St./High St. unsignalized intersection. Intersection was studied relative to level of service (LOS), capacity, queue and sight distance. The intersection was analyzed in the existing unsignalized condition and a signalized scenario. A report was transmitted with analyze, calculations conclusion and recommendations.
Contact: Town of Reading, Joseph Delaney, PE (781) 942-9077

 
Andrews Crossing, Littleton, MA
Performed site design and traffic impact assessment (TIA) study, highway widening and signalized intersection design for this 121,100 sf shopping center complex. Site design included utility connections, grading, layout and circulation. The TIA was for a MEPA Environmental Impact Report (EIR) and conformed to the EOEA/EOTC Guidelines for EIR/EIS Traffic Impact Assessments. Fourteen intersections were studied for project generated traffic impacts.
Contact: Ryan Development, Robert Walker, (978) 692-9450 back to list

 
Worcester Redevelopment Authority, Worcester, MA
Performed roadway and traffic engineering design for the Harding Street extension in connection with the Union Station Revitalization Project. The project included performing intersection layouts, traffic signalization and signalization coordination for the three intersections designed. A traffic count program was developed to validate the need for intersection signalization.
Contact: Worcester Redevelopment Authority, Cindy Blondin, (508) 799-5500 back to list

 
Massachusetts Port Authority, East Boston, MA
Performed intersection designs for the Central Artery/Tunnel (CA/T) for constructing intersections on East Boston roadways. Sign locations and type, conforming to the Manual on Uniform Traffic Control Devices (MUTCD) were developed.
Contact: DeMatteo Construction Co., Bill Willand, (617) 561-5042 back to list

 

Court Yard by Marriott, Raynham, MA

 

Performed full site design engineering, including grading, parking lot layout, utility connections and relocations, storm water management design, landscape architecture and traffic design. Project permits at the local and state level were obtained.

Contact: Project Manager, Scott Thayer, (603) 623-8811 back to list

 

Route 110 Widening, Westford, MA    find out more about this project

 


Designed a highway widening to facilitate a left hand turn movement into Primrose development project. Performed queue analysis, geometric design, pavement marking and signing plans, and general construction plans including sections and details to MassHighway standards. Submitted 25%, 75% and final PS&E documents to MassHighway for review and approval. Also, coordinated with the Town of Westford for review and comments.
Contact: Ryan Development, Robert Walker, and (978) 692-9450 back to list

 

Minots Corner, Westford, MA

 

 

GEOD is presently in the process of redesigning this highly congested and poorly performing signalized intersection located at Boston Road/Route 110/Carlisle Road, Westford Massachusetts. The intersection is being designed to allow for southbound protected double left hand turns due to the high volume of traffic. The Town of Westford has a Master Plan with sidewalks, which are being accounted for in the design. A functional design report (FDR) and 25% designs have been accepted by MassHighway and the Town of Westford, and 75% design documents are near completion.
Contact: Ryan Development, Robert Walker, and (978) 692-9450 back to list

 
Route 2 Widening, Concord, MA
Completed construction documents for the widening of Route 2 between Fairhaven Road and Sudbury Road in Concord, Massachusetts. Project included analyzing the Route 2/Sudbury Road signalized intersection, Fairhaven Road and the Fairhaven Road/Sudbury unsignalized intersection. Deceleration and acceleration lane designs were performed utilizing MassHighway design criteria for sufficient transition lengths. Curb cut permits are presently being sought for the project.
Contact: Ryan Development, Robert Walker, and (978) 692-9450 back to list

 
South Boston Transportation Study, South Boston, MA
Performed comprehensive traffic impact assessment (TIA) study, for a twelve intersection radius. Trip distribution models were developed with the Massachusetts Central Transportation and Planning Section (CTPS) cooperation and extensive traffic data base. Intersections were analyzed using numerous models and network configurations to best maximize the existing street network.
Contact: Meredith & Grew, Brian Fallon, (617) 330-8000 back to list

 
Leominster Bus Route Study, Leominster, MA
Performed transportation study for the impact of two new schools on the existing schools bus routes. All bus routes were mapped for distance, time and movements with and without the new schools. New routes were designed for all buses with the two new schools. A report was developed and submitted.
Contact: Mount Vernon Group, Frank Tedescho, and (781) 438-9700 back to list

 
Richard Road, Lexington, MA
Designed the reconstruction of approximately 1,000 feet of Richard Road in Lexington, Massachusetts. The reconstruction included water connection, drainage improvements, improved driveway aprons, and a new pavement section. Preliminary and final design plans were submitted and approved by the Town for construction.
Contact: Daniel Taylor (978) 692-9450 back to list

 
Wrentham Crossing, MA
GEOD is in the process of performing a traffic impact assessment (TIA) for this office complex located on Route 1A (adjacent to Interstate 495) in Wrentham Massachusetts. The TIA is in full compliance with the EOEA/EOTC guidelines for performing TIA's.
Contact: Ryan Development, Robert Walker, and (978) 692-9450 back to list

 
Harvard Law School, Cambridge, MA
Performed an access/egress study for a new building, the Aiken Building, located at the Harvard Law School in Cambridge Massachusetts. The study analyzed vehicular and pedestrian routes to and from the new building based on the existing street network, adjacent buildings and parking lots.
Contact: Emil Frie, Shawmut Design (617) 338-6200 back to list