Meeting House Brook Drainage Improvements, Medford, MA

 


BEFORE

 


AFTER

 

 
Designed and created construction documents for the design of a storm water drainage system which was in failure. The main trunk line was caving in on local properties and creating a sink hole effect in back yards. We worked with the City Engineer to reline the pipe and correct the situation without having extreme burdens on the abutters.
Contact: Laird Walsh, Assistant City Engineer - Medford, (781) 393 - 2452

 
Silvia Elementary School, Fall River, MA find out more about this project
Performed site design and storm water management design of a 21.0 acre site for a new elementary school in the City of Fall River. Drainage design included studying 400 acre watershed to ascertain the drainage effects on a 24 inch culvert under Meridian Street. Project required extensive site and roadway access design, and, storm water design including new catch basins, manholes, drainage piping and numerous detention/retention basins. Pre and post development storm water runoff were analyzed. The use of best management practices (BMP's) were incorporated and percent total suspended solids (TSS) were calculated. Project required several construction phases including staged drainage designs.
Contact: Terry Sullivan, Director of Public Works - Fall River, (508) 324-2000

 
Birchland Park School, East Longmeadow, MA
Performed storm water management design for this 34.5 acre site. Project required extensive storm water design including new catch basins, manholes, hundreds of feet of piping and numerous detention/retention basins. Pre and post development storm water runoff were analyzed. The use of best management practices (BMP's) were incorporated and percent total suspended solids (TSS) were calculated. Project required several construction phases including staged drainage designs. Obtained Wetlands Protection Act permit and water quality certificate.
Contact: Moriece & Gary, Ben Gary, (617) 776-7600 back to list

 
Conley School, Whitman, MA
Performed civil engineering site design including drainage analysis, utility relocation/connection, and grading for this 9-acre elementary school. Also performed existing conditions and boundary survey plans for the school.
Contact: Mount Vernon Group, Frank Tedescho (781) 438-9700 back to list

 
Pond Street Recreational Complex, Norfolk, MA
Performed storm water management design for this 21.4 acre site. Project required extensive storm water design including new catch basins, manholes, hundreds of feet of piping and numerous detention/retention basins. Pre and post development storm water runoff were analyzed. The use of best management practices (BMP's) were incorporated and percent total suspended solids (TSS) were calculated. Project required several construction phases including staged drainage designs. Obtained Wetlands Protection Act permit and water quality certificate.
Contact: Moriece & Gary, Ben Gary, (617) 776-7600 back to list

 
Mercury Air Building, Lincoln, MA
Performed civil engineering site development design for this site located at Hanscom Field in Lincoln MA. We designed the utility relocations/connections, site grading and storm water management design. The storm water management design included the use of best management policies (BMP's) as per the Massachusetts Department of Environmental Protection. Drainage design included designing a detention basin with culvert to discharge to the Hanscom Field drainage infrastructure system. Obtained NPDES groundwater discharge permit.
Contact: BGA, Inc., Bernie Goba, (781) 395-2827 back to list

 

Gordon College, Danvers, MA  

 


BEFORE

 


AFTER

 
Performed storm water management design for numerous projects on the Gordon College campus including a 3.31 acre site for an extension and site design of Rhodes Gymnasium. Project required extensive storm water design including new catch basins, manholes, drainage piping and numerous detention/retention basins. Pre and post development storm water runoff were analyzed. The use of best management practices (BMP's) were incorporated and percent total suspended solids (TSS) were calculated. Project required several construction phases including staged drainage designs. Project required several construction phases including staged drainage designs. Obtained Wetlands Protection Act permit and water quality certificate.
Contact: Moriece & Gary, Ben Gary, (617) 776-7600 back to list